Solar Panel Installation Requirements
1. Structural Engineer statement that the roof will handle the load of the solar panels
2. A) Stamped Electrical Drawings
B) "PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN" sticker shall be on meter channel.
C) Please send installation photos via email attachment to the Electrical Inspector for preliminary inspection prior ro site inspection.
3. Manufacturer's specifications on solar system
4. Property survey if solar array is ground mount
5. Electrical and Building Permit is required